00 - Muz/
00 Pictures/
001_Balai Bomba/
20200421 email kpkt/
20200422 Topo/
20200422 email pap/
20200427 present 1/
20200625 email sapinas/
20200625 pengesahan rekabentuk/
20200629 Presentation-Pengesahan Rekabentuk/
20200630 email pngesahan rekabentuk/
20200724 Tender azm/
20200727 Submission/
20200826 Construction/
20200902 approval by bomba/
20201118 kronologi to kpkt/
20201119 MDP to jab teknikal/
20201208 akn 2 mdp/
2021/
20210114 Kelulusan Bahan AOA to MTR.pdf
20210203 mesyuarat pra pembinaan/
20210403 DPBP2/
20210818 MTR-KPKT-JBPM-2021-067_ METHOD OF STATEMENT SUBMISSION (RED BRICK).pdf
20211122 BBP landscape/
20220127 tandas balai aras 1.pdf
20220224 Drainage Submission/
20220404 BBP Arch 1 Construction dwg.DWG
20220404 BBP Arch 2 Construction dwg.dwg
20220405 approved DP/
20220519 Bomba-Ceiling Plan.pdf
20220525 M.S Railing Detail.pdf
20220526 M.S Railing Detail.pdf
20220624 pos malaysia/
20220809 Interlocking Concrete pavers - Dataran/
20221013 bomba cpm eot2/
20221109 Approved BP/
20230406 eot 3/
20230606 BBP Pic/
20230609 BPP NCR/
20230613 Lawatan awal arkitek/
20230713 -BBP 2 Pindaan Ketinggian Tandas Kuartes/
20230915 site pic/
20231201 ATTENDANCE BBP.pdf
20231218 app/
20240117 USB Defect List Arch/
20240130 As Built By MTR/
20240402 shower head/
20240404 WC Urinal/
20240416 OKU WC/
20240430 Pindaan Rekabentuk 09 Tandas OKU.pdf
20240523-  Pindaan Bilik Air 1/
20240624 CPC/
20240826 BBP Arch 1 As-Built .DWG
20241126 - Mesyuarat Teknikal DLP No. 1 Balai Bomba Putatan.docx
20241126 - Mesyuarat Teknikal DLP No. 1 Balai Bomba Putatan.pdf
AS-BUILT DRAWING ARCHI/
Authority/
Azzim/
BB& Kuarters Putatan - Pematuhan Rekabentuk Shower Head 5.4.2024.pdf
BK-PEMB-PK(P)-08-07_BORANG SUBMISSION SAMPEL BAHAN.pdf
BK-PEMB-PK(P)-08-14_BORANG PINDAAN REKABENTUK.pdf
BOMBA/
Bomba - Dec/
Bomba-Jan/
CONFIRMATION/
Draft - CPC Recommendation.docx
INTERAKSI KELULUSAN BAHAN (REV.7.DIS.2023).doc
Kawalan Kualiti Perunding/
Kuarters Ceiling Plan/
Laporan COW/
Material Submission/
Meeting Site/
Meeting recording/
Method of Statement/
Minit Mesyuarat DLP/
Pengesyoran CMGD/
Ps/
Signages/
Standard Signboard KPKT - (PPR) - 2020/
Supplemental Agreement No. 2/
Surat/
Surat Lanjutan Perkhidmatan Perunding Arkitek.pdf
Tandas OKU BBP/
Ulasan Bomba/
WPS/
[Recording] - Mesyuarat KPK Bil. 12.2022/
alamat.txt
cowBBPUTATAN.pdf
desktop.ini
rekabentuk PPE bay jentera terkini.pdf
z P05_NIA1902_Balai Bomba_Beaufort/